SGI Rackable C2112-4G3 Betriebsanweisung Seite 39

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 104
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 38
Install the System into a Rack
007-5759-001 15
Install the Server in a Rack
Warning: The SGI Rackable C2112-4G3 server weighs up to 85 lbs (38.6 kg) Always use
proper lifting techniques when you move the server. Always get the assistance of another
qualified person when you install the sever in a rack. Failure to do so may result in serious
personal injury or damage to the equipment.
You should now have rails attached to both the server chassis and the rack unit. The next step is
to install the server into the rack.
1. Extend the outer rails as shown in Figure 2-2.
2. Align the inner rails of the chassis with the outer rails on the rack.
3. Slide the inner rails into the outer rails, keeping the pressure even on both sides. When the
chassis has been pushed completely into the rack, it should click into the locked position.
4. Optional screws are recommended to secure and hold the front of the chassis to the rack.
Figure 2-2 Installing the Server in a Rack
!
Seitenansicht 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 103 104

Kommentare zu diesen Handbüchern

Keine Kommentare